New Jersey Now Requires Solar or a Battery to Qualify for Its Commercial EV Charging Grant
The NJEDA raised the Take Charge minimum grant to $100,000 and now requires solar panels or a battery system on site as part of the work. NJ Cool Phase 2 also wants the heating or cooling system replaced. Both programs are closed to applications right now, which is exactly the window to get the engineering done.
Read the brief